WASTE-TO-ENERGY PLANT
1894. SHRI PRABHAKAR REDDY VEMIREDDY
Will the Minister of NEW AND RENEWABLE ENERGY be pleased to state:

(a) whether it is a fact that 15 MW of Waste-to-Energy plant is going to come up in Kondaveedu

village in Guntur district of Andhra Pradesh;

(b) if so, the details thereof; and

(c) the details of distribution process of energy once the plant is completed?

ANSWER

THE MINISTER OF NEW & RENEWABLE ENERGY AND POWER

(SHRI R.K. SINGH)

(a)to(c) Yes Sir, it is a fact that a 15 MW Waste-to-Energy plant has come up in Kondaveedu village

in Guntur district of Andhra Pradesh. The plant developed by M/s Jindal Urban Waste Management

(Guntur) Limited has been commissioned on 1st October, 2021.

The plant is designed to scientifically process approximately 1600 TPD of Municipal Solid Waste.

M/s Jindal Urban Waste Management (Guntur) Limited has signed a Power Purchase Agreement

(PPA) with AP Southern Power Distribution Company Limited (APSPDCL) for a period of 25yrs

from the Commercial Operation Date (COD).

The generated electricity is exported to the grid through a 132/33 kV grid substation located at

Vengalayapalem, District Guntur, Andhra Pradesh.

Latest From Toxics Link

Reports

Hazardous But Invisible Baseline Report On Persistent Organic Pollutants (PoPs) in Tamil Nadu, India

Participation

The Basel, Rotterdam, and Stockholm (BRS) Conventions’ Conferences of the Parties

Event

Towards Zero Waste: Circular Economy (CE) in Waste Management

Project

Strengthening capacities for managing Biomedical waste

Explore Further

Our Publications

Explore our collection of publications, including reports, case studies, brochures, pamphlets, etc.

In the News

Go through the archive of press and media coverage about Toxics Link and our work through the decades.